Free tool
RFI log
- No sign-up, no email
- Nothing stored
In short
An RFI log records every request for information you send, when you sent it, when an answer is due and when it came. Enter your RFIs and the log works out the days each one has been open, which are past the response date you set, the average time to answer and the total cost and delay you have flagged. Print it for the next site meeting.
Your RFI log
Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.
RFIs
Type dates as year-month-day, like 2026-11-30. Leave Answered blank while it is open. The response time is yours: type the due date your contract gives.
| No. | Subject | Drawing or spec | Issued | Response due | Answered | Cost impact | Days of delay | Remove |
|---|---|---|---|---|---|---|---|---|
Enter the as-of date.
How it is calculated
- Days open
- The answered date, or the as-of date while it is unanswered, minus the issued date.
- Past the response date
- An RFI with no answer whose response-due date is before the as-of date. Due on the as-of day is not yet late.
- Average days to answer
- The days open of the answered RFIs, added up and divided by how many there are.
- Cost and delay claimed
- The cost impacts and the days of delay of all the RFIs added up.
Worked example
- RFI 001 was issued on 2 November and answered on 6 November: 4 days. RFI 002 was issued on 10 November and is still open on 30 November: 20 days, and past its 17 November response date.
- The average time to answer is 4 days over the one answered RFI. If RFI 002 flags $1,250 and 2 days of delay, those are the totals shown.
What it assumes
- The response period is yours: type the due date your contract gives. No standard period is built in.
- Cost and delay are what you flag on each RFI. They are not a claim and not a change order.
- Dates are plain calendar dates you type as year-month-day.
- Nothing you type is saved or sent. Print or download the log before you leave the page. Sample format. Check it fits your contract and local rules.
Review the text and adjust it to your own policies and contract before you send or sign it.
Questions
What is an RFI in construction?
A request for information: a written question sent to the designer or owner when the drawings or specifications are unclear or in conflict. The answer is recorded so everyone builds to the same thing.
How long should an RFI take to answer?
Your contract says. Many set a number of days, and some say a late answer can support a claim for delay. Type the due date the contract gives, and the log flags any RFI still open after it.
What should an RFI log include?
The number, a short subject, the drawing or spec reference, who sent it and to whom, the issue date, the response-due date, the answer date, and any cost or time impact. This log has the columns most sites use.
How does an RFI become a change order?
If the answer changes the scope, you price the change and send a change order. Flag the cost and delay on the RFI as soon as you know them, then use the change order calculator on this site to price it.
Nagi Construction Management Suite
Nagi Construction Management Suite includes RFIs, submittals and change orders, with the effect of a change on the contract, budget and billing.
Read more
Related free tools
- Construction purchase order with budget impact
Write a purchase order for a job and cost code, see what it does to the budget and match order, receipt and invoice.
- Submittal log with submit-by dates
Work back from the date each item is needed on site to the date its submittal must go out, and see which are late.
- Progress billing and retainage calculator
Work out an application for payment from your schedule of values, with change orders, retainage and stored materials.
- G702-style pay application generator
Make a printable application for payment with nine summary lines and a continuation sheet, in your browser.