Construction purchase order with budget impact

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

A construction purchase order commits money to a vendor against a job and a cost code, so it should show what it does to that code's budget before it goes out. Enter the job, the lines, the tax and freight and the budget, and the generator prints the order and shows how much of the cost code is committed afterwards. A second section matches what was ordered, received and invoiced.

Purchase order with budget impact

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

The order number is the job code and a sequence.

Lines

Lines
DescriptionQuantityUnit priceRemove

Type the rate that applies.

%

Before this order.

Left blank: no standard terms text is added.

Left in the budget after this order

12,647.00

87.35% of the cost code would be committed.

Left before this order
18,000.00
This order
5,353.00
Committed after
87,353.00

Purchase order RR-27-014

Delivery: 2026-12-03

Vendor
Northgate Supply Co.
14 Quarry Road

Deliver to
Riverside Retail Unit, 2 Dock Street (gate B)
Job RR-27 · Cost code 03-300 Concrete

Order lines
DescriptionQtyUnit priceAmount
Rebar 12 mm, 6 m lengths2004.35870.00
Ready-mix concrete, 25 MPa (m3)30128.503,855.00
Subtotal
4,725.00
Tax
378.00
Freight
250.00
Total
5,353.00

Ordered by Tomas Reyes

Sample format. Check it fits your contract and local rules.

Three-way match: order, receipt and invoice

0 flags any difference.

%

Match lines

Pay what was ordered, received and invoiced at the agreed price. Anything else is flagged for a look before payment.

Match lines
ItemOrderedReceivedInvoicedOrder priceInvoice priceRemove

1 line needs a look

362.00

Billed above what the order and the receipts support.

Rebar 12 mm: Matched
-
Ready-mix concrete (m3): Billed above what was received
362.00

How it is calculated

Order total
Each line is quantity times unit price, rounded to the cent. Tax is the rate you type on the subtotal, and freight is added after tax.
Committed after
What is already committed on the cost code plus the total of this order.
Left in the budget
The cost code budget less the committed amount after this order. A negative number means the code would be overcommitted.
Three-way match
An invoice should not bill more units than were received, nor at a higher price than ordered. Any difference is flagged, and the money billed above what the order and the receipts support is added up.

Worked example

  • 200 pieces of rebar at 4.35 and 30 cubic meters of concrete at 128.50 make a subtotal of 4,725.00. With 8% tax of 378.00 and freight of 250.00 the order totals 5,353.00.
  • On a cost code with a budget of 100,000 and 82,000 already committed, an order of 12,000 leaves 6,000. An order of 23,500 takes the code 5,500 over budget.

What it assumes

  • The tax rate and the freight are the ones you type. No tax rules are built in.
  • The terms box is left blank unless you add text. No standard terms are supplied: use your own.
  • The match compares the quantities and prices you enter. It does not read invoices.
  • Sample format. Check it fits your contract and local rules.
  • Nothing you type is saved or sent. Print or download the order before you leave the page.

Review the text and adjust it to your own policies and contract before you send or sign it.

Questions

What should a construction purchase order include?

The order number, the job and cost code, the vendor, the delivery address and date, the lines with quantity and price, tax and freight, the total and who ordered it. The cost code is what lets you track the commitment against the budget.

What is budget impact?

It is what the order does to the cost code's budget: how much is committed afterwards and how much is left. If the order takes the code over budget, you see it before you send the order.

What is a three-way match?

Comparing the purchase order, the delivery receipt and the vendor's invoice before you pay. The three should agree on quantity and price. Anything that does not is checked first.

How should I number purchase orders?

Many companies use the job code followed by a running number, so each order can be traced to its job. This page builds the number that way from the job code and the next number in sequence.

Is anything saved or uploaded?

No. Everything runs in your browser and nothing is stored or sent.

Nagi Construction Management Suite

Nagi Construction Management Suite builds subcontracts and purchase orders with commitments, and matches vendor bills to them.

Read more

Related free tools

  • Change order calculator

    Build a change order price from labor, materials, equipment and subcontractors, with markup, bond and delay days.

  • Change order form generator

    Price a change order and print the form with the cost build-up, the new contract sum and signature lines.

  • RFI log

    Log requests for information, see how long each has been open and which are past the response date, with cost and delay totals.