Exclusive sale

Up to 64% off yearly and lifetime licenses

Ends December 15, 2026, 23:59 UTC
See the prices
Skip to content
Nagi Software
Cart

Free tool

Estimate and proposal generator

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

An estimate adds up what a job costs you, then adds overhead and the margin or markup you want to get the price. Enter your cost lines, overhead and pricing, and the generator works out the price and prints a proposal with the scope, the price, a payment schedule and signature lines. The proposal shows your price, not your costs.

Price the job

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

Cost lines

Cost is quantity times unit cost, plus the waste percentage. Your costs, not your prices.

Cost lines
DescriptionTypeQuantityUnitUnit costWaste %Remove
From cost to price
% of direct cost
% of direct cost
Price it by

Share of the price you keep. A 20% margin is a 25% markup.

%

Your rate, on the cost of the material lines.

%

Only to show the price per unit of area.

Payment draws

Must add up to 100%. Leave empty to show no schedule.

Payment draws
When% of totalRemove
The proposal

Price to quote

12,133.80

2,426.76 gross profit: a 20% margin, 25% markup.

Material
4,410.00
Labor
2,757.00
Subcontract
1,500.00
Direct cost
8,667.00
Overhead
1,040.04
Total cost
9,707.04
Price
12,133.80

The proposal shows the scope and the price, not your costs or your margin.

Your proposal, ready to print

Proposal

Sample format. Check it fits your contract and local rules.

Date
30 November 2026
Valid until
30 December 2026
Prepared for
Amira Hassan
Prepared by
Kestrel Builders
Project
Main bathroom remodel
Scope of work

Remove the existing bathroom fittings. Supply and install new tile, fixtures and finishes. Plumbing by our licensed subcontractor. Clean up on completion.

What is included
  • Tile, fixtures and finishes (1 lot)
  • Labor (60 h)
  • Plumbing (1 lot)
Price
Price12,133.80
Total12,133.80
Payment schedule
Payment schedule
Deposit30%3,640.14
When the tile is set30%3,640.14
On completion40%4,853.52
Allowances

Tile and fixtures: the amount in this price. Any choice above it is a change order.

Exclusions

Work behind walls found to be damaged, painting outside the bathroom, permit fees.

Client: accepted, signature and date

Contractor: signature and date

How the price is built

Line cost
Quantity times unit cost, times (1 plus the waste percentage).
Direct cost
All the line costs added up.
Contingency and overhead
Each is its percentage times the direct cost.
Total cost
Direct cost plus contingency plus overhead.
Price by margin
Total cost divided by (1 minus the margin).
Price by markup
Total cost times (1 plus the markup).
Sales tax on materials
The tax rate you type times the cost of the material lines, added after the price.
Payment draws
The total times each draw's percentage. The last draw takes the cents, so the draws add up to the total.

Worked example

  • A bathroom remodel. Materials $4,200 with 5% waste is $4,410. Labor is 60 hours at $45.95: $2,757. The plumbing subcontract is $1,500. Direct cost is $8,667.
  • Overhead at 12% of direct cost is $1,040.04, so the total cost is $9,707.04.
  • At a 20% margin the price is $9,707.04 ÷ 0.80 = $12,133.80, which is $2,426.76 of gross profit and a 25% markup. A 25% markup on the same cost gives the same price.

What it assumes

  • Every figure is yours: the unit costs, the waste, the overhead, the contingency and the margin. Nothing here is a standard rate or a regional cost.
  • Contingency and overhead are both worked out on the direct cost. If you apply overhead to the cost with contingency added, raise the overhead percentage to match.
  • Tax is figured on the cost of the material lines. If your rules tax the marked-up price, type a rate that reflects that.
  • The proposal is a sample format. Check it fits your contract and local rules, including what a proposal or contract must say where you work.
  • The price per unit of area is an output only: the generator never prices a job from an area.
  • Nothing you type is saved or sent. Print the proposal or download the costs before you leave the page.

Review the text and adjust it to your own policies and contract before you send or sign it.

Questions

How do I price a job: markup or margin?

Either works if you know which you used. Markup adds a percentage to cost. Margin is the share of the price you keep, so a 20% margin needs a 25% markup. Pick the one your books use and let the generator show the other.

What should an estimate include and exclude?

Include the scope in plain words, the quantities and the allowances. Exclude, in writing, anything you have not priced, such as permit fees, hidden damage or work outside the scope. The proposal has boxes for the scope, allowances and exclusions.

How do I add overhead?

Divide a year of overhead by a year of direct job costs to get the percentage, and type it in. The markup vs margin calculator on this site works that figure out from last year's numbers.

How many payment draws should a proposal have?

That depends on the job and your contract. A deposit, a few milestones and a final payment is common. The draws here must add up to 100% of the total, and the last one takes any cents left over.

Can I turn this proposal into a contract and a billing schedule?

The draws are the start of a schedule of values. Copy them into the pay application generator on this site to bill against them, or into a contract your own way. Nagi Construction Management Suite turns an estimate into the contract, the budget and the bill in one program.

Nagi Construction Management Suite

Nagi Construction Management Suite builds estimates from your own price book, with assemblies you reuse, and the estimate becomes the contract, the budget and the bill.

Read more

Related free tools

All free tools for contractors