Exclusive sale

Up to 64% off yearly and lifetime licenses

Ends December 15, 2026, 23:59 UTC
See the prices
Skip to content
Nagi Software
Cart

Free tool

Skills matrix builder

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

A skills matrix lists your people down one side and the skills the work needs across the top, with each person's level in each box. Set a target level for each skill and the builder shades the gaps, shows who can cover each skill and flags any skill that only one person can do, the single points of failure. Nothing you type leaves your browser.

Your team and the skills it needs

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

One name per line.

One per line: the skill, a comma, the level the team needs (0 to 4).

3 by default. A skill with only one such person is a single point of failure.

Levels: 0 none, 1 learning, 2 can do with help, 3 can do alone, 4 can teach. Rename them in your own words if you like; the numbers are what count.

Skill level of each person; a cell is shaded when it is below the target
PersonEstimating (target 3)Scheduling (target 2)Site safety (target 4)
Ana
Rajgap 2gap 1
Meigap 3
Single points of failure
Estimating
Skills nobody can cover
None
Gap in Estimating
5 (Raj 1 of 3, Mei 0 of 3)
Gap in Site safety
1 (Raj 3 of 4)

Who can cover

Estimating
Ana
Scheduling
Raj, Mei
Site safety
Ana, Raj, Mei

How it is calculated

Gap
The target level of a skill minus the person's level, never below zero.
Can cover
A person is at the cover level you set (3 by default) or above in the skill.
Single point of failure
A skill that exactly one person can cover. If that person is away, nobody can do it.
No cover
A skill that nobody can cover at the cover level.
Top gaps
Skills ordered by the sum of everyone's gap, largest first.

Worked example

  • The skill is estimating and the team needs level 3. Ana is at 3 and Raj is at 1. Raj's gap is 2, one person can cover it, and it is flagged as a single point of failure.
  • Scheduling has a target of 2, and Raj and Mei are both at 3: two people can cover it, so a gap there is not a risk.

What it assumes

  • Levels run from 0 to 4: none, learning, can do with help, can do alone, can teach. Agree what each means in your team before you rate anyone.
  • The cover level and every target are yours. No industry standard is built in.
  • A skills rating is a conversation, not a verdict. Ratings are sensitive: nothing you type is saved or sent, so print or download before you leave the page.
  • Sample format. Check it fits your policy and local rules.

Review the text and adjust it to your own policies and contract before you send or sign it.

Questions

What is a skills matrix and how do I fill it in?

A grid of people and skills with a level in each box. List the skills the work really needs, agree what each level means, then rate each person with them. Set a target for each skill so the gaps show.

What levels should I use?

Five levels from 0 to 4 are enough for most teams: none, learning, can do with help, can do alone, can teach. Fewer levels are easier to agree on. The builder takes any target from 0 to 4.

How do I spot single points of failure?

Look for a skill that only one person can cover. The builder flags them. Cross-training a second person on those skills is usually the cheapest way to lower the risk.

What is the difference between a skills matrix and a training matrix?

A skills matrix shows how good people are at a skill. A training matrix shows which courses and certificates people hold and when they run out. The training matrix on this site covers the second.

Is my data saved or uploaded?

No. Everything runs in your browser and nothing is stored, so people's ratings stay on your computer. Print or download the matrix before you close the page.

Nagi HR Suite

Nagi HR Suite keeps employee records with their documents, and performance records, on your own computer.

Read more

Related free tools

All free tools for HR teams