Free tool
Bradford Factor calculator
- No sign-up, no email
- Nothing stored
In short
The Bradford Factor is B = S² × D, where S is the number of separate absence spells and D is the total days absent, over a rolling 52 weeks. Three spells totaling nine days score 81, while one nine-day spell scores 9. Enter real absence dates and your working days, and the calculator counts the spells and days for you.
Score one employee
Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.
Enter the date to score up to.
Score a whole team
Paste a table with a header row: Name, From (first day), To (last day, blank for one day) and, if you like, Leave out (yes). The same date, working days and triggers as above apply to everyone. Dates are year-month-day.
Enter the date to score up to, above.
How it is calculated
- Bradford Factor
- The number of spells, squared, times the total days absent: B = S × S × D.
- Period
- The 52 weeks (364 days) that end on the date you pick, both ends included.
- Days absent
- Working days only, by the working pattern you choose. A weekend inside a Friday-to-Monday absence is not counted.
- Spells
- Absences on consecutive working days are one spell. A Friday and the next Monday are one spell; a Friday and the next Tuesday are two.
- A whole team
- Paste a table of name, first day and last day, and everyone is scored on the same date, working days and triggers. People are matched ignoring capital letters and extra spaces.
- Absence rate
- Days absent divided by the working days in the same 52 weeks.
Worked example
- Three spells totaling 9 days: 3² × 9 = 81.
- One spell of 9 days: 1² × 9 = 9.
- Nine spells of one day: 9² × 9 = 729.
- The same nine days lost give three very different scores, because the formula weighs the number of spells much more than the number of days.
What it assumes
- The team table uses one working pattern and one set of triggers for everyone. Rows it cannot read are listed with their line and left out, never guessed.
- The score is an indicator that some employers use. The trigger points are your own policy: the five shown are examples only, so set yours.
- Public holidays are not built in. A holiday counts as a working day unless you take that weekday out of the pattern. Leave out an entry if your policy does not count it.
- An entry that starts before the 52 weeks counts only the days inside them.
- Absences your policy does not count, such as those linked to a disability or to pregnancy, may need separate handling under your policy and local rules. Tick Leave out for them and they are ignored.
- A score is a prompt to talk to the employee, not a decision. The result is an estimate for planning.
These results are estimates for planning. Check them against your own records and policies before you use them in a bid, a payroll run or an employee's balance.
Questions
What is a Bradford Factor score and how is it calculated?
It is a number that weighs short, frequent absences more than one long one. Count the separate absence spells (S) and the total days absent (D) over the last 52 weeks, then calculate S × S × D. Three spells totaling 9 days score 81; one spell of 9 days scores 9.
What score is too high?
There is no standard. Each employer sets its own trigger points, and any bands in a guide are examples. Decide yours in your absence policy, apply them the same way to everyone and write them down. The triggers in the calculator are boxes you can change.
How are part-time workers and weekends handled?
Pick the weekdays the employee works. Only those days count as days absent, and two working days with a day off between them, such as a Monday and a Wednesday for someone who works Monday, Wednesday and Friday, are consecutive working days and so one spell.
Should disability or pregnancy-related absence count?
That is a decision for your policy and local rules, and it can matter a great deal for how you treat the person. The calculator lets you tick Leave out on any entry, and that absence is then ignored in the score, the spells and the days.
Can I score a whole team at once?
Yes. Paste a table with a header row of Name, From and To, and the page scores each person and lists them from the highest score down. Download the result as a CSV file. The table stays in your browser.
What counts as one spell?
Absences on consecutive working days. If someone is off on a Friday and the next Monday, that is one spell of two working days, because the weekend is not a working day. If they are back at work on the Monday and off again on the Tuesday, that is two spells.
Nagi HR Suite
Nagi HR Suite keeps leave and attendance records for each employee in one place, on your own computer, so the dates behind a score are already there.
Read more
Related free tools
- Employee offboarding checklist builder
Build an offboarding checklist with owners and due dates counted from the last working day, for the role and the equipment.
- New hire onboarding checklist builder
Build a new hire onboarding checklist with owners and due dates counted from the start date.
- Training and certification matrix
Track who has done which course and certificate, what is about to expire, and what is overdue, with a due list.
- Working days calculator
Count the working days between two dates or find the date that is a number of working days away, with your own weekend and holidays.