Free tool
Labor hours and productivity calculator
- No sign-up, no email
- Nothing stored
In short
Labor hours are the quantity of work divided by how much a person or crew gets done in an hour. Enter the quantity, your own rate and the size of the crew to get the total hours, the hours each and the working days, with cost if you add a wage. A second check compares what a crew really did with what you estimated, so you can revise the hours.
Labor hours for a quantity of work
Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.
Labor hours
40
10 hours each, about 1.25 working days for the crew.
- Hours at the rate you typed
- 40
Man hours from a crew
Man hours
160
People × hours a day × days.
Did the crew beat the estimate?
Productivity factor
0.83
16.67% slower than estimated.
- Hours at the estimated rate
- 33.33
- Hours at the actual rate
- 40
- Difference
- +6.67 hours
Productivity factor is actual output per hour divided by estimated output per hour. A factor below 1 means slower than estimated. Some teams quote it the other way round, as hours divided by estimated hours, so check which one your team means.
How it is calculated
- Labor hours
- The quantity divided by the units done per hour, or the quantity times the hours needed per unit. Then divided by the efficiency as a fraction.
- Crew days
- Total hours divided by the crew size gives hours each. That divided by the hours in a working day gives days.
- Man hours
- People times hours a day times days.
- Cost
- Hours times the wage, with the overtime share of the hours paid at the multiplier you type.
- Productivity factor
- Actual units per hour divided by estimated units per hour. Below 1 means slower than estimated.
Worked example
- 1,000 square feet at 25 square feet an hour is 40 hours. A crew of 4 takes 10 hours each, or 1.25 days of 8 hours.
- If the crew did 25 square feet an hour against 30 estimated, the factor is 0.83: the same job takes 40 hours instead of 33.33, an extra 6.67.
What it assumes
- The output rates are yours, from past jobs. No productivity tables are built in, because they depend on the trade, the site and the crew.
- Efficiency is how close the crew works to the rate typed. 100% means on the rate.
- The crew size only spreads the hours into days. It does not change the total hours.
- Nothing you type is saved or sent.
These results are estimates for planning. Check them against your own records and policies before you use them in a bid, a payroll run or an employee's balance.
Questions
How do I calculate labor hours?
Divide the quantity of work by the output per hour. 1,000 square feet at 25 square feet an hour is 40 labor hours. Use hours per unit instead if that is how your estimate is written.
What are man hours?
Man hours are the total hours worked by everyone on a job: people times hours a day times days. Four people working 8 hours for 5 days make 160 man hours.
What is a productivity factor?
It is actual output divided by estimated output. A factor of 0.83 means the crew is 17% slower than the estimate, so the remaining work will take longer.
How do I revise hours when a crew is slower than estimated?
Divide the quantity still to do by the rate the crew is actually achieving. The second check on this page does it and shows the extra hours.
Is anything saved or uploaded?
No. Everything runs in your browser and nothing is stored or sent.
Nagi Construction Management Suite
Nagi Construction Management Suite keeps daily logs and timesheets with committed, actual and forecast cost for every cost code.
Read more
Related free tools
- Equipment cost per hour calculator
Work out what a machine or truck costs to own and run per hour or per mile, and when owning beats renting.
- Labor burden rate calculator
Work out what one worker really costs per productive hour, with every cost line shown.
- Progress billing and retainage calculator
Work out an application for payment from your schedule of values, with change orders, retainage and stored materials.
- G702-style pay application generator
Make a printable application for payment with nine summary lines and a continuation sheet, in your browser.