Free tool
Workforce succession planning builder
- No sign-up, no email
- Nothing stored
In short
Workforce succession planning is deciding, before someone leaves, who could take over each critical job. List your roles, who holds them, how much it would hurt if they were empty, and who could step in and how soon. The builder flags every role with nobody ready now, orders them by what to look at first and shows who covers if a person is away tomorrow.
Succession plan by role
Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.
Critical roles
Successors: a name with how ready they are in brackets, like Priya Nair (now); Raj Patel (1-2); Lee Adams (3+). Now means ready now, 1-2 and 3+ are years. Impact and chance of leaving are 1 low to 3 high.
| Role | Held by | Impact if empty | Chance of leaving | Successors | Remove |
|---|---|---|---|---|---|
- Roles with a ready-now successor
- 1
- Roles with no ready-now successor
- 2
- Roles with nobody named
- 1
- Look at first (impact x chance of leaving)
- Estimator, Safety lead, Project manager
| Role | Held by | Bench | Status |
|---|---|---|---|
| Site manager | Dan Keller | Priya Nair (ready now), Raj Patel (3 or more years) | Covered |
| Estimator | Sue Ward | Tom Brooks (3 or more years) | No ready-now successor |
| Project manager | Ana Torres | Mei Chen (1 to 2 years) | No ready-now successor |
| Safety lead | Mei Chen | nobody named | Nobody named |
If someone is away tomorrow
- Site manager: Priya Nair (ready now), Raj Patel (3 or more years)
9-box grid
People
Rate performance (how well they do the job now) and potential (how far they could grow) on the same scale. Both are judgments: agree the meaning first.
| Name | Performance | Potential | Remove |
|---|---|---|---|
9-box grid
Trusted professional
High performer
Mei Chen
Star
Ana Torres
Effective
Lee Adams
Core player
Tom Brooks
High potential
Risk
Sam Ortiz
Inconsistent
Enigma
Raj Patel
Ratings are a conversation starter, not a verdict. Sample format.
How it works
- Bench status of a role
- Covered when at least one successor is ready now. No ready-now successor when successors are named but none is ready now. Nobody named when there are none.
- Look at first
- For flagged roles, the impact if the role is empty (1 to 3) times the chance the person leaves (1 to 3), highest first.
- Emergency cover
- For one person, the successors of every role they hold, ready now first.
- 9-box grid
- Performance and potential, each low, medium or high, give nine boxes from star (high and high) to risk (low and low). A 1 to 5 rating is mapped to thirds: 1 and 2 low, 3 medium, 4 and 5 high.
Worked example
- The site manager role is held by Dan and has Priya ready now, so it is covered. The estimator role has one successor who needs 3 or more years, so it is flagged as having no ready-now successor.
- The safety lead role has nobody named. With impact 3 and a chance of leaving of 3, the estimator scores 9 and is the first to look at.
- A person rated 3 on performance and 3 on potential is a star. A person rated 1 on performance and 3 on potential is an enigma: capable, not performing yet.
What it assumes
- This is workforce succession planning: who could take over a job at work. It is not about estates or family businesses.
- Ratings are judgments. Agree what performance and potential mean in your team, and rate the work and the evidence, not the person.
- Ratings are sensitive. Nothing you type is saved or sent, so they stay on your computer. Print or download before you leave the page.
- The builder places and counts what you type. It does not decide who should succeed whom. Sample format. Check it fits your policy and local rules.
Review the text and adjust it to your own policies and contract before you send or sign it.
Questions
What is succession planning and who needs it?
It is naming, ahead of time, who could take over each critical role and how soon. Any company with a role that would be hard to fill in a hurry needs it, including a small business whose owner is also its estimator.
How many successors should a role have?
At least one who is ready now for the roles that matter most, and one or two more who are 1 to 2 years away. The builder flags a role with nobody ready now.
How do I rate potential fairly?
Use the same questions for everyone, such as how fast they learn and how they handle a bigger job, and base the rating on what you have seen, not on a feeling. Have a second person rate too and compare. Treat the box as the start of a conversation.
What does emergency cover mean?
Who can stand in for a person if they are away tomorrow: the ready-now successors of the roles they hold. The builder lists them for any person you pick.
Is it safe to put ratings in an online tool?
Here, nothing is uploaded: the page works in your browser, and nothing is saved or sent. Print or download the plan to keep it, and delete the file when you no longer need it.
Nagi HR Suite
Nagi HR Suite keeps employee records with their documents, and performance records, on your own computer.
Read more
Related free tools
- PTO accrual calculator
See how much leave an employee has earned by any date, with carry-over and leave already taken.
- Bradford Factor calculator
Score absences with the Bradford Factor from real dates, a rolling 52 weeks and your own working days.
- Sales commission calculator
Work out tiered commission two ways, marginal and retroactive, with a cap, a split and bonus modes.
- Shift differential calculator
Turn clock times into pay with night or weekend premiums and overtime, with the overtime method shown both ways.