Subcontractor scope of work generator by trade

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

A subcontractor scope of work says exactly what a trade will do, what it will not do and what others must provide. Pick a trade and you get a starting list of included work, excluded work and what the contractor or owner provides, which you edit to match your drawings. Price the lines and the page totals them for a schedule of values, then prints the scope or saves it for Word.

Build the scope

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

Trade

Picking a trade replaces the lists below with a starting point. Edit every line: a real scope follows your drawings and specifications.

Work included

Give a line a price if you want it to feed a schedule of values. Lines without a price stay in the scope and add nothing to the total.

Work included
Scope linePrice (optional)Remove

One line each.

One line each.

Allowances

Money set aside for something not yet chosen, to be settled against the actual cost.

Allowances
ItemAllowanceRemove

Milestones

Milestones
MilestoneDate (YYYY-MM-DD)Remove
Priced lines (5 of 5)
75,400.00
Allowances, kept apart
6,500.00

Scope of work: Electrical

Project: Riverside Retail Unit · Contractor: Kestrel Builders · Subcontractor: Bright Spark Electric

Work included

  • Supply and install the main switchboard and distribution boards shown on the drawings (18,500.00)
  • Conduit, cable and wiring for power and lighting (42,000.00)
  • Light fixtures, switches and outlets as scheduled (9,800.00)
  • Final connections to equipment supplied by others (3,600.00)
  • Testing and labeling of circuits (1,500.00)

Work not included

  • Temporary power and lighting
  • Fire alarm and security systems
  • Data and communications cabling
  • Utility connection fees
  • Cutting and patching of walls and floors

Provided by the contractor or owner

  • Access to work areas
  • Openings and sleeves through structure at the agreed locations

Allowances

  • Light fixtures: 6,500.00

Milestones

  • Rough-in complete: 5 Feb 2027
  • Fixtures and trim complete: 9 Apr 2027

Cleanup and protection

Remove packaging and waste from the work area at the end of each working day.

Not a contract. Sample format. Check it fits your contract and local rules.

How it works

Starting lists
Each trade starts with included work, excluded work and what others provide. They are a starting point to edit, not a complete scope.
Priced lines
Each included line can carry a price. The total adds the priced lines in whole cents; lines without a price add nothing.
Allowances
Allowances are money set aside for something not yet chosen. They are kept apart from the priced lines.
Schedule of values
The CSV file has one row for each scope line and its price, ready to paste into a schedule of values.

Worked example

  • An electrical scope with five included lines priced at 18,500, 42,000, 9,800, 3,600 and 1,500 totals 75,400.00. A lighting allowance of 6,500 is shown on its own.
  • Choosing roofing instead replaces the lists with roofing work, exclusions such as structural repairs to the deck, and what the contractor provides, such as roof access.
  • A flooring scope with three priced lines of 12,000, 8,500 and 2,250 totals 22,750.00, and the CSV file then has three rows, one for each line.

What it assumes

  • The lists are a starting point for a typical job and may be wrong for yours. Edit every line to follow your drawings and specifications.
  • This is a scope, not a contract. It has no payment, insurance, warranty or dispute wording: add what your own subcontract needs.
  • Prices are the ones you type. Nothing is looked up.
  • Nothing you type is saved or sent. Print or download the scope before you leave the page.

Review the text and adjust it to your own policies and contract before you send or sign it.

Questions

What is a scope of work in construction?

A written description of the work a contractor or subcontractor will do: what is included, what is not, what others provide and when. It sits alongside the drawings and specifications.

What should a subcontractor scope of work include?

The work in detail, the exclusions, what the contractor or owner provides, allowances, the milestones and the cleanup. Clear exclusions prevent most disputes about extras.

Why list exclusions?

Because a gap between two trades is where extra charges start. Writing down what is not included makes the gaps visible before the work does.

How does the scope link to a schedule of values?

Price each included line and download the lines as a CSV file. Each row can become a line of the schedule of values you bill against.

How detailed should a subcontractor scope be?

Detailed enough that two people reading it would price the same job. Name the work by area or system, give quantities or drawing references where you have them, and say who provides what. Vague lines such as all necessary work are where disputes about extras begin.

What is the difference between a scope of work and a subcontract?

The scope describes the work. The subcontract adds the terms around it: price and payment, schedule, insurance, warranty, changes and how disagreements are handled. The scope is usually attached to the subcontract as a schedule.

What is an allowance in a scope?

Money set aside for something not yet chosen, such as light fixtures. It stays separate from the priced lines so everyone can see what is firm and what depends on a selection. Say in the scope what happens if the final choice costs more or less.

Is anything saved or uploaded?

No. Everything runs in your browser and nothing is stored or sent.