Scope of work: Electrical
Project: Riverside Retail Unit · Contractor: Kestrel Builders · Subcontractor: Bright Spark Electric
Work included
- Supply and install the main switchboard and distribution boards shown on the drawings (18,500.00)
- Conduit, cable and wiring for power and lighting (42,000.00)
- Light fixtures, switches and outlets as scheduled (9,800.00)
- Final connections to equipment supplied by others (3,600.00)
- Testing and labeling of circuits (1,500.00)
Work not included
- Temporary power and lighting
- Fire alarm and security systems
- Data and communications cabling
- Utility connection fees
- Cutting and patching of walls and floors
Provided by the contractor or owner
- Access to work areas
- Openings and sleeves through structure at the agreed locations
Allowances
- Light fixtures: 6,500.00
Milestones
- Rough-in complete: 5 Feb 2027
- Fixtures and trim complete: 9 Apr 2027
Cleanup and protection
Remove packaging and waste from the work area at the end of each working day.
Not a contract. Sample format. Check it fits your contract and local rules.