Exclusive sale

Up to 64% off yearly and lifetime licenses

Ends December 15, 2026, 23:59 UTC
See the prices
Skip to content
Nagi Software
Cart

Free tool

ID card maker

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

An employee ID card shows who a person is and where they work: the name, the job title, an ID number and a photo. Type your people or paste a list, pick the company name and color, and the maker draws a front and a back at credit card size, with a barcode of the ID, and lays them out on sheets ready to print. Photos and the logo stay in your browser.

Make the cards

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

Everything stays in your browser: the list, the photos and the logo are never uploaded. A workplace badge is not an official identity document, and this page does not make government, driving license or national ID lookalikes.

Paste a table with a header row, or load a CSV file. Columns it understands: name, job title, employee ID, department, joining date, emergency contact, blood group, photo.

Photos are matched by the photo column, then by employee ID, then by name, for example E-1001.jpg or amira hassan.png.

Card type
Paper

6 cards: 1 page of fronts and 1 of backs, 10 to a page (2 by 5) at 85.6 by 54 mm.

In the print window choose Margins: None and Scale: 100%. For both sides, print the front pages, turn each sheet over on its long edge and print the back pages: the backs are mirrored to line up. Printing on PVC cards needs a card printer or a print shop.

Kestrel Logistics
EMPLOYEE
Photo
Amira Hassan
Operations Coordinator
Operations
ID E-1001
Since 2021-01-04
Kestrel Logistics
EMPLOYEE
Photo
Tomas Reyes
Estimator
Estimating
ID E-1002
Since 2018-07-16
Kestrel Logistics
EMPLOYEE
Photo
Daniel Okafor
Head of People
People
ID E-1003
Since 2026-03-02
Kestrel Logistics
EMPLOYEE
Photo
Mei Chen
Safety Lead
Site
ID E-1004
Since 2022-09-12
Kestrel Logistics
EMPLOYEE
Photo
Raj Patel
Site Manager
Site
ID E-1005
Since 2019-05-20
Kestrel Logistics
EMPLOYEE
Photo
Sue Ward
Accounts Clerk
Finance
ID E-1006
Since 2023-11-06

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0102

Blood group: O+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0101

Blood group: A+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0104

Blood group: AB+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0103

Blood group: B+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0106

Blood group: A-

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0105

Blood group: O-

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

How it works

Card size
85.6 by 54 millimeters, the standard credit card size (ISO 7810 ID-1) that card printers and holders use.
Cards per sheet
The sheet width and height, less an 8 mm margin all round, divided by the card size and rounded down: 2 by 5, so 10 cards, on A4 and 2 by 4, so 8 cards, on Letter.
Backs
The back pages put each row in the opposite order, so the back of a card lines up with its front when you turn the sheet over on its long edge.
Barcode
The ID is written as a Code 128 barcode: a start symbol, one symbol per character, a check symbol and a stop symbol, where the check is the start value plus each character value times its position, divided by 103, remainder kept.

Worked example

  • A list of 25 people on A4 makes 3 sheets of fronts: 10, 10 and 5 cards. A matching 3 sheets of backs follow.
  • The ID E-101 becomes a barcode of 7 symbols of 11 modules each, plus a stop symbol of 13: 90 modules wide.

What it assumes

  • This makes a workplace badge. It is not an official identity document, and the page does not make government or national ID lookalikes.
  • Printing on PVC cards needs a card printer or a print shop. On paper, cut the cards out along the faint lines.
  • The barcode holds only the ID text. Check that your reader accepts Code 128 before you print a batch.
  • Photos, logo and list are read in your browser and never uploaded. Close the page and they are gone.

Review the text and adjust it to your own policies and contract before you send or sign it.

Questions

How do I make an employee ID card?

Type the name, job title and ID number, add a photo and the company name and logo, pick a color, and print. This page draws the front and the back and fits them on sheets.

What size is an ID card?

Most are 85.6 by 54 millimeters, or 3.37 by 2.13 inches, the same as a credit card. Card printers and holders are made for that size.

Can I make many cards at once?

Yes. Paste a table or load a CSV file with one person per row and the maker draws every card, up to 500, and counts the sheets. The bulk page has an example list.

What should go on the back?

A line that the card belongs to the company, who to give it to if it is found, and an emergency contact if you collect one. Keep personal details to what the badge needs.

Is anything saved or uploaded?

No. The list, the photos and the logo stay in your browser and nothing is stored or sent. Print or save as PDF before you close the page.

Nagi HR Suite

Nagi HR Suite keeps employee records, with documents for each person, on your own computer.

Read more

Related free tools

All free tools for HR teams