Exclusive sale

Up to 64% off yearly and lifetime licenses

Ends December 15, 2026, 23:59 UTC
See the prices
Skip to content
Nagi Software
Cart

Free tool

Bulk ID card generator from Excel or CSV

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

To make ID cards in bulk, keep your people in a spreadsheet with a header row, save it as CSV and load it here. Each row becomes one card; photos are matched to people by the photo column, the ID or the name, and the cards are laid out on sheets with matching backs. Everything stays in your browser.

Make the cards

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

Everything stays in your browser: the list, the photos and the logo are never uploaded. A workplace badge is not an official identity document, and this page does not make government, driving license or national ID lookalikes.

Paste a table with a header row, or load a CSV file. Columns it understands: name, job title, employee ID, department, joining date, emergency contact, blood group, photo.

Photos are matched by the photo column, then by employee ID, then by name, for example E-1001.jpg or amira hassan.png.

Card type
Paper

6 cards: 1 page of fronts and 1 of backs, 10 to a page (2 by 5) at 85.6 by 54 mm.

In the print window choose Margins: None and Scale: 100%. For both sides, print the front pages, turn each sheet over on its long edge and print the back pages: the backs are mirrored to line up. Printing on PVC cards needs a card printer or a print shop.

Kestrel Logistics
EMPLOYEE
Photo
Amira Hassan
Operations Coordinator
Operations
ID E-1001
Since 2021-01-04
Kestrel Logistics
EMPLOYEE
Photo
Tomas Reyes
Estimator
Estimating
ID E-1002
Since 2018-07-16
Kestrel Logistics
EMPLOYEE
Photo
Daniel Okafor
Head of People
People
ID E-1003
Since 2026-03-02
Kestrel Logistics
EMPLOYEE
Photo
Mei Chen
Safety Lead
Site
ID E-1004
Since 2022-09-12
Kestrel Logistics
EMPLOYEE
Photo
Raj Patel
Site Manager
Site
ID E-1005
Since 2019-05-20
Kestrel Logistics
EMPLOYEE
Photo
Sue Ward
Accounts Clerk
Finance
ID E-1006
Since 2023-11-06

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0102

Blood group: O+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0101

Blood group: A+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0104

Blood group: AB+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0103

Blood group: B+

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0106

Blood group: A-

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

This card is the property of the company. It must be worn on site and shown on request. Report a lost card at once.

In an emergency: +1 555 0105

Blood group: O-

If found, return to: Kestrel Logistics, reception

Workplace badge, not an official identity document.

How it works

The list
The first row names the columns. The reader finds name, job title, ID, department, joining date, emergency contact, blood group and photo by their usual header names, in any order.
Photos
A photo file is matched to a person by the photo column, then the ID, then the name, ignoring capital letters, spaces and the file ending.
Sheets
10 cards to a sheet on A4 and 8 on Letter, so 25 people make 3 sheets of fronts and 3 of backs.
Barcode
Each ID is drawn as a Code 128 barcode, with a check symbol worked out from the characters.

Worked example

  • The example list has 6 people. On A4 that is 1 sheet of fronts and 1 of backs, with 6 cards used and 4 places empty.
  • A file named E-1001.jpg is matched to the person whose ID is E-1001, and amira hassan.png to Amira Hassan.

What it assumes

  • Save an Excel sheet as CSV (comma, semicolon or tab separated) before you load it. A header row is needed, with at least a name column.
  • The cards are workplace badges, not official identity documents.
  • No more than 500 cards at a time. Split a bigger list into batches.
  • Photos, logo and list are read in your browser and never uploaded.

Review the text and adjust it to your own policies and contract before you send or sign it.

Questions

How do I make ID cards from an Excel list?

Save the sheet as CSV, load it here, add the photos and the logo, and print. Each row becomes a card with a front and a back.

What columns does the list need?

A name column is needed. Job title, ID, department, joining date, emergency contact, blood group and photo are used when they are there, and the header names can be written in several common ways.

How are photos matched to people?

By the photo column if you have one, then by the ID, then by the name, without regard to capital letters, spaces or the file ending, for example E-1001.jpg.

How do I print both sides?

Print the front pages, turn each sheet over on its long edge and print the back pages. The backs are mirrored row by row so they line up.

Is the list uploaded anywhere?

No. The list and the photos are read in your browser and nothing is stored or sent. Close the page and they are gone.

Nagi HR Suite

Nagi HR Suite keeps employee records, with documents for each person, on your own computer.

Read more

Related free tools

  • ID card maker

    Design an employee ID card with photo and barcode, front and back, and print it on A4 or Letter sheets.

  • PTO accrual calculator

    See how much leave an employee has earned by any date, with carry-over and leave already taken.

  • Relieving letter generator

    Write a relieving letter from the joining date, job title and date of relieving, then print it or open it in Word.

  • Working days calculator

    Count the working days between two dates or find the date that is a number of working days away, with your own weekend and holidays.

All free tools for HR teams