Exclusive sale

Up to 64% off yearly and lifetime licenses

Ends December 15, 2026, 23:59 UTC
See the prices
Skip to content
Nagi Software
Cart

Free tool

eNPS calculator with margin of error

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

The employee Net Promoter Score is the percentage of promoters (scores 9 and 10) minus the percentage of detractors (0 to 6), a number from -100 to 100. Enter your counts or paste the scores and this calculator shows the score with its margin of error, because a score from a few dozen answers can move a lot by chance. A second check compares two surveys and says whether the change is larger than chance.

Your eNPS and how sure you can be of it

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

Enter
Confidence

Employee Net Promoter Score

25

From 80 answers. The 95% confidence interval runs from 8.2 to 41.8.

Promoters
45%
Passives
35%
Detractors
20%
Margin of error
± 16.8 points
Standard error
8.57 points

Did it really change?

Enter the counts from an earlier survey. The page says whether the change from then to the survey above is larger than chance at the confidence you picked.

Change in eNPS

+12.5

Within the margin of 23.97 points: it could be chance. Ask more people or wait for the next survey.

How it is calculated

eNPS
The percentage of promoters minus the percentage of detractors. Passives (7 and 8) count in the total but not in the score.
Standard error
100 times the square root of (promoter share plus detractor share minus the square of their difference), divided by the number of answers.
Margin of error
The standard error times 1.96 for 95% confidence (1.28, 1.64 or 2.58 for 80%, 90% and 99%).
Change between surveys
The difference of the two scores, compared with the margin that comes from the two standard errors combined.

Worked example

  • 36 promoters, 28 passives and 16 detractors out of 80 answers make 45% promoters and 20% detractors, so the eNPS is 25.
  • The standard error is 8.57 points, so at 95% confidence the margin is about 16.8: the true score is probably between 8 and 42.

What it assumes

  • The margin of error treats the answers as a random sample of the people you asked. It does not allow for people who did not answer.
  • The 0 to 10 scale and the cut-offs at 9 and 7 are the usual ones. If you use another scale, the result is not an eNPS.
  • A small group gives a wide margin. Treat a score from fewer than about 30 answers as a rough guide.
  • Nothing you type is saved or sent. Do not share answers that could identify one person.

These results are estimates for planning. Check them against your own records and policies before you use them in a bid, a payroll run or an employee's balance.

Questions

How do I calculate eNPS?

Ask how likely people are to recommend the company as a place to work, from 0 to 10. Take the share who answer 9 or 10, subtract the share who answer 0 to 6, and you have a score from -100 to 100.

What is a good eNPS?

There is no single answer. Scores differ by industry, country and company size, so compare yours with your own past surveys first. Anything above zero means more promoters than detractors.

Why does the score have a margin of error?

Because you asked a limited number of people. With 80 answers a score of 25 could easily be 10 or 40 in another sample. The margin shows that range, and it shrinks as more people answer.

How do I know if a change is real?

Compare the change with the margin from both surveys. If the change is larger, it is unlikely to be chance. The second section does this for you.

Is anything saved or uploaded?

No. Everything runs in your browser and nothing is stored or sent.

Nagi HR Suite

Nagi HR Suite keeps employee records, with a lifecycle timeline for each person, on your own computer.

Read more

Related free tools

All free tools for HR teams