Exclusive sale

Up to 64% off yearly and lifetime licenses

Ends December 15, 2026, 23:59 UTC
See the prices
Skip to content
Nagi Software
Cart

Free tool

Offer letter generator

Works in your browser. Nothing you type is sent anywhere or saved.
  • No sign-up, no email
  • Nothing stored

In short

An offer letter tells the candidate the job, the start date, the pay and the main terms, and asks for a reply by a date. Fill in the boxes and the generator writes the letter beside them. Print it, save it as a PDF, or download it for Word and edit the wording.

Fill in the blanks

Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.

For example 52,000 per year or 25.00 per hour.

For example 40 hours a week, Monday to Friday.

For example 3 months. Leave blank for none.

For example 15 days of paid time off a year.

Every required box is filled in.

Offer of employment

30 November 2026

Dear Amira Hassan,

We are pleased to offer you the position of Operations Coordinator at Kestrel Logistics, reporting to the Operations Manager. Your start date is 4 January 2027.

The main terms of the offer are:

  • Pay: 52,000 per year, paid monthly.
  • Working hours: 40 hours a week, Monday to Friday.
  • Probation: your first 3 months are a probation period.
  • Leave: 15 days of paid time off a year.

Please confirm that you accept this offer by replying by 11 December 2026. If you have any questions before then, we are glad to answer them.

We look forward to welcoming you to Kestrel Logistics.

Sincerely,

Daniel Okafor, Head of People

Accepted by Amira Hassan: signature and date

Sample format. Check it fits your contract and local rules. Nothing you type is saved or sent: print, download or copy the letter before you leave the page.

How the letter is built

Fields to sentences
Each box fills one place in a fixed sentence. The wording is plain, so you can edit it in Word after you download it.
Optional boxes
Reports to, working hours, probation and leave are optional. If you leave one blank, its line is left out of the letter.
Blank required boxes
A required box that is blank shows in square brackets in the letter, such as [Job title], and the page lists what is still blank.

Worked example

  • Company Kestrel Logistics, candidate Amira Hassan, job Operations Coordinator, starting 4 January 2027.
  • The letter reads: We are pleased to offer you the position of Operations Coordinator at Kestrel Logistics. Your start date is 4 January 2027.
  • The pay, hours, probation and leave you fill in become bullet points, and the letter asks for a reply by the date you set.
  • If you leave the probation and leave boxes empty, those two bullets are not printed. The letter shows only the lines you filled in.

What it assumes

  • This is a sample format. Check it fits your contract and local rules, including anything an offer must say where you hire.
  • The wording is neutral and short on purpose. Add your own terms in Word, such as benefits, notice and conditions.
  • Nothing you type is saved or sent. Print, download or copy the letter before you leave the page.
  • The pay line is free text, so write the amount, the currency and the period the way you want it to read.

Review the text and adjust it to your own policies and contract before you send or sign it.

Questions

Is this offer letter ready to send as it is?

It is a sample format that covers the usual points: job, start date, pay, hours, probation, leave and a reply date. Read it, add what your own terms need, and check it fits your contract and local rules before you send it.

Can I download it in Word?

Yes. The Word button saves the letter as a file that Word opens and lets you edit. You can also print it, save it as a PDF from the print window, or copy the text.

What should an offer letter include?

The job title, the start date, the pay and how often it is paid, the working hours, who the person reports to, any probation period and the date by which you need an answer. This generator has a box for each of those points, and you can add anything else your terms need, such as conditions of the offer, in Word.

How is an offer letter different from an employment contract?

An offer letter is a short document that proposes the job and its main terms and asks for a yes. A contract sets out the full terms in detail and both sides sign it. Some companies send the offer first and the contract after the candidate accepts, and others use the letter alone, so check what your local rules expect.

How should I write the pay line?

Write the amount, the currency and the period together, for example $4,800 per month, paid on the last working day. The pay box is free text, so it appears in the letter exactly as you type it. Say plainly whether the figure is before or after tax, and mention a bonus only if it is part of the offer.

Is my data saved or uploaded?

No. The letter is built in your browser and nothing is sent anywhere. Because nothing is saved, download or print it before you close the page.

Can I add my letterhead?

Print the letter on your own letterhead paper, or download the Word file and paste the text into your template.

Nagi HR Suite

Nagi HR Suite keeps employee records in one place on your own computer, so the details you type into a letter are already on file.

Read more

Related free tools

All free tools for HR teams