Free tool
9-box grid builder
- No sign-up, no email
- Nothing stored
In short
A 9-box grid places each person by two ratings: performance, how well they do the job now, and potential, how far they could grow. High on both is a star, low on both is a risk, and the seven boxes between have their own names. Enter your people and their ratings, on a 1 to 3 or 1 to 5 scale, and the grid fills in.
9-box grid
Example numbers are filled in so you can see how it works. Replace them with yours. Nothing you type leaves this page.
People
Rate performance (how well they do the job now) and potential (how far they could grow) on the same scale. Both are judgments: agree the meaning first.
| Name | Performance | Potential | Remove |
|---|---|---|---|
9-box grid
Trusted professional
High performer
Mei Chen
Star
Ana Torres
Effective
Lee Adams
Core player
Tom Brooks
High potential
Risk
Sam Ortiz
Inconsistent
Enigma
Raj Patel
Ratings are a conversation starter, not a verdict. Sample format.
How it works
- The nine boxes
- Performance (low, medium, high) down the side and potential (low, medium, high) across the top. The box is named by the pair, from star to risk.
- A 1 to 5 scale
- Mapped to thirds: 1 and 2 are low, 3 is medium, 4 and 5 are high.
- Groups
- Top talent is the high-performance and high-potential boxes; core is the middle box; risk is low performance with low or medium potential.
Worked example
- Ana is rated 3 on performance and 3 on potential: a star. Raj is rated 1 on performance and 3 on potential: an enigma, with capacity that is not showing yet.
- Tom is 2 and 2, a core player, and Sam is 1 and 1, in the risk box.
- On a 1 to 5 scale, a person rated 5 and 4 lands in the same star box.
What it assumes
- Box names are common labels. Teams rename them, and the names are a way of talking, not a ranking of worth.
- Ratings are judgments. Agree what performance and potential mean in your team and base each rating on evidence.
- Ratings are sensitive. Nothing you type is saved or sent. Print or download the grid before you leave the page.
- Sample format. Check it fits your policy and local rules.
Review the text and adjust it to your own policies and contract before you send or sign it.
Questions
How do I read a 9-box grid?
Read it as two questions. Across: how far could this person grow? Down: how well do they do the job now? The top right box, the star, is high on both. Most people sit in the middle. The grid starts a talent conversation: it does not decide pay or promotion.
What is the difference between performance and potential?
Performance is results in the current role. Potential is the ability to take on a bigger or different role. Someone can perform very well in a role they will never outgrow, and someone with high potential may not be performing yet.
Should I use a 3-point or a 5-point scale?
Three points are easier to agree on and map straight to the boxes. If you already rate on five, the grid maps 1 and 2 to low, 3 to medium and 4 and 5 to high.
Is my data saved or uploaded?
No. The grid is built in your browser and nothing is stored or sent. Print or download it before you close the page.
Nagi HR Suite
Nagi HR Suite keeps employee records with their documents, and performance records, on your own computer.
Read more
Related free tools
- PTO accrual calculator
See how much leave an employee has earned by any date, with carry-over and leave already taken.
- Bradford Factor calculator
Score absences with the Bradford Factor from real dates, a rolling 52 weeks and your own working days.
- Sales commission calculator
Work out tiered commission two ways, marginal and retroactive, with a cap, a split and bonus modes.
- Shift differential calculator
Turn clock times into pay with night or weekend premiums and overtime, with the overtime method shown both ways.